Configuration capture
Existing wheel, tyre, hub, fastener and service constraints are recorded as the modernization baseline.
Mobility interface renewal
A structured path for reviewing legacy wheel-end configurations and integrating current runflat, beadlock and related mobility components without treating the vehicle as a blank sheet.
REPA Runflat
Modernization begins with what must remain unchanged. Repa maps those boundaries before proposing a new component interface.
AS-IS / BASELINE
TO-BE / TARGET
Existing wheel, tyre, hub, fastener and service constraints are recorded as the modernization baseline.
Proposed runflat and beadlock solutions are checked against fit, installation and maintenance access.
The new configuration is documented so platform teams can understand what changed and what did not.
Production and supply planning can be aligned to phased fleet introduction, subject to programme scope.
Capture the in-service configuration and limitations.
Define the intended mobility and support outcome.
Resolve physical and service interfaces.
Release the approved configuration and transition records.
Modernization records identify the baseline, approved interfaces and applicable part revisions so field and supply teams work from the same configuration.
Explore compliance →Not necessarily. The scope depends on the existing configuration, target outcome and interface constraints.
A lawful sample and available technical information can support the baseline study, subject to condition and scope.
No. Certification responsibilities and validation scope must be defined for each programme and authority.
Our team will route it to the relevant Repa engineering, manufacturing or commercial function.
Discuss your requirement →